Analisis Kesiapan Kontraktor Kecil Dalam Menghadapi Pelaksanaan Pekerjaan Proyek Pemerintah Di Kabupaten Ende

Authors

  • Yohanes Berkhemans Yodaker Universitas Flores, Ende, Indonesia
  • Yohanes Meo Universitas Flores, Ende, Indonesia
  • Veronika Miana Radja Universitas Flores, Ende, Indonesia

DOI:

https://doi.org/10.37478/teknosiar.v16i1.2110

Abstract

The government is trying to eliminate complaints from the tender system that has been implemented so far, of course, to bring equality and accelerate budget absorption so that development can run smoothly and the welfare of the community is realized. To implement the principles of Good Governance and Clean Government, the government must be ready to implement the principles of accountability, resources, finance, technology, and innovation, and complete qualifications, efficiently and implement good and impartial actions and regulations, as well as ensure interaction economic and social relations between the government. The research method consists of literature study, determination of research object, data collection by using questionnaires and interviews, and data analysis. The object of this research is a small-scale contractor in Ende Regency, under the auspices of APAKSINDO (Association of Indonesian Construction Entrepreneurs) Ende branch. The method of data collection was done by questionnaire to the contractor. Data from the questionnaire was then analyzed including validity test and linear regression analysis and T-test analysis. The results of this study indicate the level of readiness of contractors in the Ende Regency, some state that they are ready for all the regulations given by the Ende Regency Construction Services and some state that they are not ready. The more dominant readiness factors include the readiness of resources, finance, technology and innovation, and qualifications that affect the level of contractor readiness.

Downloads

Download data is not yet available.

Keywords:

Small scale contractor, Apaksindo, Contractor readiness

References

Anthony, Robert N. Govindarajan, Vijay. 2005. Management control system. Terjemahan oleh Drs. F.X Kurniawan, Buku satu Edisi Sebelas. Jakarta: Salemba Empat

Andi Asnudin, 2004. ”Tinjauan Proses Pengadaan kontraktor skala kecil dalam Rangka Pengembangan Infrastruktur Perdesaan”, Institut Teknologi Bandung-Bandung

Austen A.D, 1991. “Manajemen Proyek Konstruksi”, Jakarta, PT Pustaka Binaman Pressindo

Dipohusodo, Istimawan, 1996. Manajemen Proyek dan Konstruksi Jilid 1 KanisiusYogyakarta

Ervianto, Wulfram I, 2005. Teori – Aplikasi Manajemen Proyek Konstruksi, Andi: Yogyakarta

Husen, A. (2008). Manajemen Proyek Perencanaan Penjadwalan dan Pengendalian Proyek. Cetakan Pertama. Yogyakarta: Andi Offset

Keputusan Presiden RI No. 80 tahun 2003 tentang Pedoman Pelaksanaan Pengadaan Barang / Jasa Instansi Pemerintah. Peraturan Pemerintah Republik Indonesia No.28 tahun 2000, “Tentang Usaha dan Peran Masyarakat Jasa Konstruksi”, Bandung, Citra Umbara.

Konsep Pengembangan Kontraktor Skala Kecil (A. Asnudin)

Malik Alfian, 2005. Pengantar Bisnis Jasa Pelaksana Konstruksi. Andi Offset, YogyaKarta.

Nafarin, M. 2004. Penganggaran Perusahaan. Jakarta: Salemba Empat.

Peraturan Pemerintah Republik Indonesia No.29 tahun 2000, “Tentang Penyelenggaraan Pembinaan Jasa Konstruksi”, Bandung, Citra Umbara.

Pribadi Krishna S, Desember 2003. “Proses Pengadaan dan Pengembangan Usaha Jasa Konstruksi Skala Kecil”, Laporan Survey Pengadaan Jasa Konstruksi Skala Kecil Dalam Rangka Pengadaan Infrastruktur Perdesaan Berkelanjutan Sebagai Usaha Peningkatan Kesempatan Kerja di NTT, Kupang-NTT.

Rudinto. 2009. Penganggaran: Konsep dan Teknik Penyusunan Anggaran, Jakarta: Erlangga.

Sugiyono. 2011. Metode penelitian kuantitatif, Kualitatif dan R&D. Bandung: Alfabeta.

Sugiono. (2012). Memahami Penelitian Kualitatif. Bandung: Alfabeta

Downloads

Published

2024-03-04

How to Cite

Yodaker, Y. B. ., Meo, Y., & Radja, V. M. (2024). Analisis Kesiapan Kontraktor Kecil Dalam Menghadapi Pelaksanaan Pekerjaan Proyek Pemerintah Di Kabupaten Ende. TEKNOSIAR, 16(1), 45-55. https://doi.org/10.37478/teknosiar.v16i1.2110

Most read articles by the same author(s)

1 2 > >>